The EU value-chain ceiling limits what large customers may require from suppliers of up to 1,000 employees. Directive (EU) 2026/470 applies to financial years beginning on or after 1 January 2027.The EU value-chain ceilingSee what applies to you →

Carbon disclosure clause in a procurement

Public or private tender

Tenders ask for totals with a method and, often, a plan. The ledger answers the totals and the method from records; the plan is yours.

What they ask for: Scope 1 and 2 with method, sometimes Scope 3, evidence on request.

What the ledger answers

2 of 4, one disclosed, one outside scope. Every line below is either produced from your own records, produced with a method we disclose, or absent and stated as absent.

  • Scope 1 and 2 with methodGHG Protocol, operational control, AR6ledger
  • Scope 36 of 15 categories, method discloseddisclosed
  • Evidence on requestReport PDF, versioned, every figure traceableledger
  • Carbon reduction planNot a ledger functionnone

Answer from the ledger, attach the versioned report, and the buyer can recompute any line.

Answer it once, reuse it

The point of a ledger rather than a spreadsheet is that this request and the next one come out of the same records. Answering a customer questionnaire is most of the work of answering an EcoVadis assessment, a bank annex and a tender clause, because the figures, the method and the evidence are already assembled and already traceable.

Bring this request to a working session See all eight requests