Carbon disclosure clause in a procurement
Public or private tender
Tenders ask for totals with a method and, often, a plan. The ledger answers the totals and the method from records; the plan is yours.
What the ledger answers
2 of 4, one disclosed, one outside scope. Every line below is either produced from your own records, produced with a method we disclose, or absent and stated as absent.
- Scope 1 and 2 with methodGHG Protocol, operational control, AR6ledger
- Scope 34 of 15 categories, method discloseddisclosed
- Evidence on requestReport PDF, versioned, every figure traceableledger
- Carbon reduction planNot a ledger functionnone
Answer from the ledger, attach the versioned report, and the buyer can recompute any line.
Answer it once, reuse it
The point of a ledger rather than a spreadsheet is that this request and the next one come out of the same records. Answering a customer questionnaire is most of the work of answering an EcoVadis assessment, a bank annex and a tender clause, because the figures, the method and the evidence are already assembled and already traceable.
Bring this request to a working session See all eight requests